2012
DOI: 10.1139/l2012-104
|View full text |Cite
|
Sign up to set email alerts
|

Advanced formwork method integrated with a layout planning model for tall building construction

Abstract: Recent increases in the number of irregularly shaped tall buildings have created a need for more applicable formwork methods and automated support for formwork layout planning, which has mainly depended on heuristic approaches based on the intuitive judgment of experienced engineers. This study proposes a new table formwork method integrated with a systematic layout planning approach for tall building construction. Adjustable subunits of the formwork cope with diverse building shapes and the software-based mat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
17
0

Year Published

2014
2014
2021
2021

Publication Types

Select...
7
2

Relationship

2
7

Authors

Journals

citations
Cited by 23 publications
(20 citation statements)
references
References 2 publications
0
17
0
Order By: Relevance
“…Kim et al (2012) have also reported that ASF had a good potential for managing cost, time and government requirements.…”
Section: Discussionmentioning
confidence: 99%
“…Kim et al (2012) have also reported that ASF had a good potential for managing cost, time and government requirements.…”
Section: Discussionmentioning
confidence: 99%
“…By executing construction processes with standardized components, system formwork method offers a systemized operation processes with positive effects on improving quality, safety, and constructability [4]. As a result, current trend of high-rise building construction prefers to form a high-rise building structure by operating either crane-lifted-, or self-climbing formwork system during structural framework [5,6].…”
Section: Climbing Formwork System In High-rise Building Constructionmentioning
confidence: 99%
“…It has been deduced from literature review and interview with experts who majored in building structure that researches on automating layout planning of horizontal formwork and vertical temporary facilities have been previously proposed [4,[8][9][10]. In case of horizontal formwork, layout planning has been rd International Symposium on Automation and Robotics in Construction (ISARC 2016) automated based on imported floor plans of building solely by focusing on interior space, not the outer boundary of the building.…”
Section: Layout Planning Of Climbing Formwork System Compared With Otmentioning
confidence: 99%
“…In tall building construction, automated and equipment-driven methods are suggested as feasible alternatives to increase productivity in response to the decrease of skilled labor 1) . Especially, the formwork method with less manual operation can largely facilitate a reduction of the cycle time for structural framework.…”
Section: Introductionmentioning
confidence: 99%