2016
DOI: 10.4324/9781315714882
|View full text |Cite
|
Sign up to set email alerts
|

Actor Networks of Planning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 53 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The location is not part of the metro network and there is a concern that it will increase traffic occur in the West End of the city (HDC 2009). The catalyst was the long-held desire to remove the railway line that ran along the peninsula and replace it with a street-based light-rail system, and the construction of a transport interchange (Ruming et al 2016) (Figure 3). The council could be bullish about this densification as the development corporation is funding the infrastructure in the West End to enable growth.…”
Section: Forth Goods Yardmentioning
confidence: 99%
“…The location is not part of the metro network and there is a concern that it will increase traffic occur in the West End of the city (HDC 2009). The catalyst was the long-held desire to remove the railway line that ran along the peninsula and replace it with a street-based light-rail system, and the construction of a transport interchange (Ruming et al 2016) (Figure 3). The council could be bullish about this densification as the development corporation is funding the infrastructure in the West End to enable growth.…”
Section: Forth Goods Yardmentioning
confidence: 99%