“…Due to the VPP's advantages, the small islanded DERs can enter the electricity market 39 . As many of the DERs are based on erratic energy sources, the designed MG system may face power unbalance drawbacks and it can be easily regulated by the intelligent assets of VPP 40, 41, 42 . There is a substantial difference between the MG and VPP in terms of operation, characteristics, topology, and control prospective as follows: - The VPPs are grid‐connected systems, unlike the MG operate in both grid and off‐grid mode of operation.
…”