2020
DOI: 10.1109/tii.2020.2974252
|View full text |Cite
|
Sign up to set email alerts
|

Accurate and Efficient Indoor Pathfinding Based on Building Information Modeling Data

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

2
35
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 41 publications
(37 citation statements)
references
References 29 publications
2
35
0
Order By: Relevance
“…For the path results, it appears that the path obtained from Zhou's method 23 is rather an accurate one on topology than grid level. With slightly higher efficiency than Zhou's method, 23 our method can yield a shorter and more precise path. To further verify our accuracy, a stand-alone approach proposed by Lin et al 21 whose path is purely calculated with accurate grid cells is applied in our analysis.…”
Section: Efficiency and Accuracy Experimentsmentioning
confidence: 97%
See 3 more Smart Citations
“…For the path results, it appears that the path obtained from Zhou's method 23 is rather an accurate one on topology than grid level. With slightly higher efficiency than Zhou's method, 23 our method can yield a shorter and more precise path. To further verify our accuracy, a stand-alone approach proposed by Lin et al 21 whose path is purely calculated with accurate grid cells is applied in our analysis.…”
Section: Efficiency and Accuracy Experimentsmentioning
confidence: 97%
“…Focusing more on navigation, they paid less attention to the accuracy of the path yet and mainly obtained their path from a mesh connecting randomly generated internal nodes. Noted the importance of path accuracy, a recent work from Zhou et al 23 constructed a topology graph with grid cell nodes in advance through a thinner operation. With the preprocessed topology graph and position information from its cell nodes, it returned an accurate and shortest path efficiently.…”
Section: Related Workmentioning
confidence: 99%
See 2 more Smart Citations
“…For instance, the managers have to check both the components and the attribute values of the building (e.g., the width of the court) in conformity checking (Zhang and El-Gohary, 2015a). In the process of indoor navigation, it is necessary to extract geometric data from BIM for the construction of path navigation algorithm (Zhou et al, 2020). In the operation and maintenance phase, equipment managers need to extract information in various aspects of the operation performance from the BIM model , while maintenance staff tends to extract failure pattern information in building systems and components from CMMS databases (Gunay et al,2019).…”
Section: Introductionmentioning
confidence: 99%