2001
DOI: 10.1007/pl00012865
|View full text |Cite
|
Sign up to set email alerts
|

Absolute Calibration of an Ashtech Z12-T GPS Receiver

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
17
0

Year Published

2001
2001
2012
2012

Publication Types

Select...
5
2
1

Relationship

1
7

Authors

Journals

citations
Cited by 34 publications
(19 citation statements)
references
References 2 publications
0
17
0
Order By: Relevance
“…Each measurement for different technique has done 50 times. The uncertainty of absolute delay measurement using oscilloscope observation [11] [12][13] is 1.46ns. The uncertainty of absolute delay measurement using proposed technique is 0.115ns.…”
Section: Simulationmentioning
confidence: 99%
See 1 more Smart Citation
“…Each measurement for different technique has done 50 times. The uncertainty of absolute delay measurement using oscilloscope observation [11] [12][13] is 1.46ns. The uncertainty of absolute delay measurement using proposed technique is 0.115ns.…”
Section: Simulationmentioning
confidence: 99%
“…The group delay measurement technique for frequency translation devices can't be used [6] [7][8] [9]. The technique of delay calibration employed in GPS receiver channel is the observation method based on high oscilloscope [10] [11][12] [13]. Based on the principles of communication system a fall of BPSK (Binary Phase Shift Keying) signal amplitude occurs near the chip code phase converting point via band-limited channel.…”
Section: Introductionmentioning
confidence: 99%
“…One of the advantages for time metrology laboratories is the computation of the antenna phase centre coordinates by the IGS at the cm level. For the TSA at OP, the latest results are: X = 4 202 777,3831 m Y = 171 367,9881 m Z = 4 778 660,1844 m The delays of the ensemble formed by the Z12-T, the TSA, and the RF cable was differentially calibrated by the BIPM Z12-T travelling receiver, which has been calibrated in an absolute sense [6]. Three differential calibration campaigns have been undertaken by the BIPM: one in March 2001, one in February 2003 and one in June 2004.…”
Section: A Implementation Of the Gps P3 Technique At Opmentioning
confidence: 99%
“…Several variations in the CVGPS technique exist, and the magnitude of the error components depends upon the type and quality of the GPS equipment in use and the way that the data are processed. 11 For example, the differential ionospheric delay can be nearly eliminated by receiving both the L1 and L2 carrier frequencies, certain types of receivers are less sensitive to environmental changes, and certain types of antennas are more effective than others at mitigating multipath. The most sophisticated techniques and equipment can reduce the time uncertainty to a few nanoseconds or less, but the incremental performance gains are relatively small.…”
Section: Cvdo Theory Of Operationmentioning
confidence: 99%