Construction Research Congress 2018 2018
DOI: 10.1061/9780784481295.011
|View full text |Cite
|
Sign up to set email alerts
|

A Systematic Review of Applied Information Systems in Industrialized Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 18 publications
0
3
0
Order By: Relevance
“…Compared to traditional construction methods, prefabricated methods have several advantages including green and sustainability, better environmental impacts (including energy saving), higher and better efficiency (throughout the production process and of the final product), arguably lower costs, lower incident rates and better health and safety features (Liu et al, 2020a;Wang et al, 2019b;Zhong et al, 2015). However, the biggest difference between PC and traditional construction is that in PC prefabricated components are produced in a controlled factory environment and transported to the construction site for installation or assembly (Razkenari et al, 2018). This extends the PCSC and holds it responsible for the whole process of manufacturing, transportation, delivery and installation of prefabricated products (Hasim et al, 2018).…”
Section: Pcscmmentioning
confidence: 99%
See 1 more Smart Citation
“…Compared to traditional construction methods, prefabricated methods have several advantages including green and sustainability, better environmental impacts (including energy saving), higher and better efficiency (throughout the production process and of the final product), arguably lower costs, lower incident rates and better health and safety features (Liu et al, 2020a;Wang et al, 2019b;Zhong et al, 2015). However, the biggest difference between PC and traditional construction is that in PC prefabricated components are produced in a controlled factory environment and transported to the construction site for installation or assembly (Razkenari et al, 2018). This extends the PCSC and holds it responsible for the whole process of manufacturing, transportation, delivery and installation of prefabricated products (Hasim et al, 2018).…”
Section: Pcscmmentioning
confidence: 99%
“…, 2015). However, the biggest difference between PC and traditional construction is that in PC prefabricated components are produced in a controlled factory environment and transported to the construction site for installation or assembly (Razkenari et al. , 2018).…”
Section: Introductionmentioning
confidence: 99%
“…In general, big data and cloud computing are intertwined. Generally, cloud computing is a service that brings together many planned resources, manages them automatically through software and makes them available quickly, with very few people involved [107]. The deep integration of big data and cloud computing can result in major advantages in the field of prefabrication construction, such as massive data storage, fast data transmission, powerful computing capacity, automatic maintenance and data security.…”
Section: Big Data and Cloud Computingmentioning
confidence: 99%