2005
DOI: 10.3182/20050703-6-cz-1902.01426
|View full text |Cite
|
Sign up to set email alerts
|

A Survey on Supply Planning Under Uncertainties in MRP Environments

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
4
0
1

Year Published

2008
2008
2022
2022

Publication Types

Select...
6
2
1

Relationship

2
7

Authors

Journals

citations
Cited by 11 publications
(5 citation statements)
references
References 60 publications
0
4
0
1
Order By: Relevance
“…Donderwinkel [34] describes several OTIF failures, including the absence of ready-to-ship stock in the warehouse; problems with tools and production equipment; outspec quality of the final product; delay in the delivery or quality issues of raw materials; unavailability of vessel space; changes in delivery; miscommunication with the buyers regarding goods availability and delivery schedule; and the late prepayments (payment in advance before the realization of shipment). By considering the high demand of GRTO and shipments are carried out from several different warehouses, an Informatics Technology application called Enterprise Resource Planning (ERP) equipped with an inventory control system based on the Material Requirement Planning (MRP) approach is suggested to be used by Perhutani as a company with complex organizational structures [35]. Monthly safety stock or safe inventory can be predicted using sales history data combined with future demand forecasts.…”
Section: Discussionmentioning
confidence: 99%
“…Donderwinkel [34] describes several OTIF failures, including the absence of ready-to-ship stock in the warehouse; problems with tools and production equipment; outspec quality of the final product; delay in the delivery or quality issues of raw materials; unavailability of vessel space; changes in delivery; miscommunication with the buyers regarding goods availability and delivery schedule; and the late prepayments (payment in advance before the realization of shipment). By considering the high demand of GRTO and shipments are carried out from several different warehouses, an Informatics Technology application called Enterprise Resource Planning (ERP) equipped with an inventory control system based on the Material Requirement Planning (MRP) approach is suggested to be used by Perhutani as a company with complex organizational structures [35]. Monthly safety stock or safe inventory can be predicted using sales history data combined with future demand forecasts.…”
Section: Discussionmentioning
confidence: 99%
“…Another multiperiod model is proposed in Gurnani et al (1996) for assembly systems with two types of components and the lead time probability distributions are limited to two periods. For comprehensive reviews of the literature on the other models which can be used for MRP parameterization under uncertainties see Yeung et al (1998), Dolgui et al (2005) and Mula et al (2006).…”
Section: Related Workmentioning
confidence: 99%
“…For comprehensive reviews of the literature on the other models which can be used for MRP parameterization under uncertainties see (Yeung et al, 1998;Dolgui et al, 2005;Mula et al, 2006).…”
Section: Related Workmentioning
confidence: 99%