A Substation-Oriented Approach to Optimal Phasor Measurement Units Placement

Abstract: -State Estimation (SE) is the basis of a variety of advanced applications used in most modern power systems. An SE problem formed with enough phasor measurement units (PMUs) data is simply a linear weighted least squares problem requiring no iterations. Thus, designing a minimumcost placement of PMUs that guarantees observability of a power system becomes a worthy challenge. This paper proposes an equivalent integer linear programming method for substation-oriented optimal PMU placement (SOOPP). The proposed m… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
12
0

Year Published

2015
2015
2020
2020

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(12 citation statements)
references
References 34 publications
0
12
0
Order By: Relevance
“…Motivated by this, in this paper, we study the problem of minimizing the total number of substation locations where installations are performed to observe all the buses of the network. In [17], the task of placing PMUs was done substation-wise. However, the goal of [17] was to minimize the total number of devices.…”
Section: The Optimal Pmu Placement (Opp) Problemmentioning
confidence: 99%
See 2 more Smart Citations
“…Motivated by this, in this paper, we study the problem of minimizing the total number of substation locations where installations are performed to observe all the buses of the network. In [17], the task of placing PMUs was done substation-wise. However, the goal of [17] was to minimize the total number of devices.…”
Section: The Optimal Pmu Placement (Opp) Problemmentioning
confidence: 99%
“…In [17], the task of placing PMUs was done substation-wise. However, the goal of [17] was to minimize the total number of devices. As pointed in [2] and [7], the cost of the devices does not represent the major portion of the synchrophasor deployment cost.…”
Section: The Optimal Pmu Placement (Opp) Problemmentioning
confidence: 99%
See 1 more Smart Citation
“…Differently, in a generic approach presented in [26], the OPP considers the node-branch model along with the substation. However, this approach does not prioritise allocation in terms of redundancy in the substation and could cause observability problems to the MSE.…”
Section: Introductionmentioning
confidence: 99%
“…Since the PMUs are located by random selection, bisecting search approach is computationally less efficient to solve optimal PMU placement (OPP) problem. Conversely, integer linear programming (ILP) is propounded for joint optimal placement of PMUs by including the effect of conventional measurements, injection measurements, and line outages . Binary search algorithm has been employed for optimal placement of PMUs considering single branch outages .…”
Section: Introductionmentioning