A Study on the Damping Loads Prediction to prevent Harmonic Resonance during the Power System Restoration

Abstract: -During the restoration process of primary restorative transmission system, some over voltages may happen due to nonlinear interaction between unloaded transformers and transmission systems. These over voltages caused by harmonic resonance can be suppressed by inserting damping loads before energizing transformers. But it is very difficult to predict the occurrence possibility of harmonic resonance and complex simulation must be repeated to estimate the sufficient damping loads. This paper presents a damping l… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…Therefore the length of the transmission line connecting the main generator and self-starting generator is also large. The energization of long distance noload transmission line during the blackstart process by hydro units can cause various problems such as Ferranti effect [2]. This will further delay the start of the main generators and hence delay the restoration process of the power system.…”
Section: Introductionmentioning
confidence: 99%
“…Therefore the length of the transmission line connecting the main generator and self-starting generator is also large. The energization of long distance noload transmission line during the blackstart process by hydro units can cause various problems such as Ferranti effect [2]. This will further delay the start of the main generators and hence delay the restoration process of the power system.…”
Section: Introductionmentioning
confidence: 99%
“…Korea adopts the same method. However, this method can cause various problems such as the Ferranti effect [8], since the long-distance no-load transmission line is energized in restoration process. In this paper, the restoration process using BESS for primary transmission line was analyzed.…”