2014
DOI: 10.15531/ksccr.2014.5.1.1
|View full text |Cite
|
Sign up to set email alerts
|

A Study on the Application Effect of Central-Grid PV System at a Streetlamp using RETScreen - A Case Study of Gwangjin-gu

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2015
2015
2016
2016

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The present study applied the social discount rate of 5.5% proposed by the Korea Development Institute in 2013 [23] to the discount rate (r), and the project period (N) was estimated as 20 years considering the reported durability of the solar modules [24]. The electricity sales revenue was calculated by multiplying the electricity output by the sales price.…”
Section: Evaluation Of Economic Feasibilitymentioning
confidence: 99%
“…The present study applied the social discount rate of 5.5% proposed by the Korea Development Institute in 2013 [23] to the discount rate (r), and the project period (N) was estimated as 20 years considering the reported durability of the solar modules [24]. The electricity sales revenue was calculated by multiplying the electricity output by the sales price.…”
Section: Evaluation Of Economic Feasibilitymentioning
confidence: 99%
“…This study applied the social discount rate of 5.5%, as proposed by the Korea Development Institute [33], and assumed the project period to be 20 years, in line with the typical lifetime of PV systems [34,35].…”
Section: Parameter Valuementioning
confidence: 99%