“…Ref. [46] reported that dynamic scheduling may improve the performance of CGRA by 30% compared to static scheduling, and the area overhead is about 8.6%. Elastic CGRA [47] adopts the idea of elastic circuits, that is, the scheduling of operations on the datapath is not fixed, but is dynamically determined by the readiness of the operands.…”