2012
DOI: 10.1007/s00521-012-0875-8
|View full text |Cite
|
Sign up to set email alerts
|

A soft computing approach to projecting locational marginal price

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 28 publications
(6 citation statements)
references
References 16 publications
0
5
0
Order By: Relevance
“…[73][74][75]. This can also aid in optimising the locational marginal price (LMP) or nodal prices to generate more electricity from the renewable energy [76]. According to the authors of [76] and [19], the intellectual capital of artificial neural networks and support vector machines can be deployed in increasing the penetration of renewable energy through economic parameter of nodal prices.…”
Section: Cluster 5: Human Capital Development and The Economymentioning
confidence: 99%
“…[73][74][75]. This can also aid in optimising the locational marginal price (LMP) or nodal prices to generate more electricity from the renewable energy [76]. According to the authors of [76] and [19], the intellectual capital of artificial neural networks and support vector machines can be deployed in increasing the penetration of renewable energy through economic parameter of nodal prices.…”
Section: Cluster 5: Human Capital Development and The Economymentioning
confidence: 99%
“…If P r t is the amount of power transaction MG and main grid at a time t; locational marginal prices are used (given as γ t ) (Nwulu and Fahrioglu, 2013) for purchasing power between main and MG. Therefore, the cost of power transactions (C r (P r t )) can be obtained as:…”
Section: Grid-connected Microgrid Modelmentioning
confidence: 99%
“…In this work, it is assumed that there is a power transaction between the MG and the main grid; hence power can either be sold from the main grid or transferred to it. Let power transferred at any time between MG and main grid as 𝐏 𝐫 𝐭 , Locational Marginal Prices (LMP's) (given as 𝛄 𝐭 ) [14] are used for purchasing the power between MG and the main grid. Hence, the cost for power transaction (𝐂 𝐫 (𝐏 𝐫 𝐭 )) is expressed as in Eq.…”
Section: Grid-connected Microgridmentioning
confidence: 99%