2011 37th IEEE Photovoltaic Specialists Conference 2011
DOI: 10.1109/pvsc.2011.6186443
|View full text |Cite
|
Sign up to set email alerts
|

A smart control strategy for the black start of a microgrid based on PV and other auxiliary sources under islanded condition

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
11
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
8
1
1

Relationship

0
10

Authors

Journals

citations
Cited by 21 publications
(11 citation statements)
references
References 6 publications
0
11
0
Order By: Relevance
“…In recent years, with the maturation of micro-grid technology, several researchers have proposed using WPG in the black start procedure of a local network with auxiliary energy storage [6][7][8][9][10][11]. These schemes ensure that a micro grid undergoes a seamless transition from grid-connected mode to island mode when a blackout occurs in the external power network [12].…”
Section: Introductionmentioning
confidence: 99%
“…In recent years, with the maturation of micro-grid technology, several researchers have proposed using WPG in the black start procedure of a local network with auxiliary energy storage [6][7][8][9][10][11]. These schemes ensure that a micro grid undergoes a seamless transition from grid-connected mode to island mode when a blackout occurs in the external power network [12].…”
Section: Introductionmentioning
confidence: 99%
“…Furthermore, the DPGS should be able to handle large inrush load currents at the start of the re-energizing process [87]. In this case, the role of the energy-storage elements in the DPGS, such as ultra-capacitors, batteries, or flywheels, is very critical for maintaining the transient power balance of the entire system, as illustrated in Fig.…”
Section: ) Supporting Upstream Grid Black-startmentioning
confidence: 99%
“…The role of ESS is very important in order to maintain the stability of the system as they handle the transient requirement of the system [162], usually modelled as constant DC voltage sources, coupled with VSI in cases of gird connected microgrid, and inject active power into the grid in proportion to the frequency deviation at least during the initial stages of black-start process. Correspondingly, the amount of power to be connected should consider the capacity of the ESS in order to avoid any significant voltage and frequency deviation.…”
Section: Black Startmentioning
confidence: 99%