Creative Construction Conference 2018 - Proceedings 2018
DOI: 10.3311/ccc2018-097
|View full text |Cite
|
Sign up to set email alerts
|

A simulation-based approach for optimal construction planning and scheduling

Abstract: Project schedules in construction are responsible for an efficient deployment of resources on the job-site and for the overall efficiency of work progress. Current approaches too often lead towards sub-optimal work plans or, sometimes, even scarce productivity. For that reason, a lot of research was devoted to the development of automated scheduling tools, which can provide optimal solutions while requiring reasonable computational effort. As a consequence, planners can save their time and involved resources c… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 10 publications
(18 reference statements)
0
2
0
Order By: Relevance
“…Aiming to maintain an up-to-date schedule, automation of construction planning can assist to minimize the time and resources necessaries to this purpose. Automation in construction scheduling is a challenge because it requires to generate and optimize multiobjective problems, which usually include several parameters (NATICCHIA et al, 2018). Automation can be exploited if a BIM repository is used as the archive of all the information required by the optimization algorithms to perform its estimations.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Aiming to maintain an up-to-date schedule, automation of construction planning can assist to minimize the time and resources necessaries to this purpose. Automation in construction scheduling is a challenge because it requires to generate and optimize multiobjective problems, which usually include several parameters (NATICCHIA et al, 2018). Automation can be exploited if a BIM repository is used as the archive of all the information required by the optimization algorithms to perform its estimations.…”
Section: Introductionmentioning
confidence: 99%
“…spatial, geometric, quantity, relationships and material set of information) from what is stored in BIM models (KIM et al, 2013). This approach would achieve significant time reductions in scheduling, compared to the traditional manual methods (NATICCHIA et al, 2018). This paper aims to review existing literature on the subject of ontologies produced for BIM and its interoperability with the automation and simulation of construction planning (4D BIM).…”
Section: Introductionmentioning
confidence: 99%