A Simple Evaluation Method for Annual CO<sub>2</sub> Emissions Reduced by Distribution Loss Minimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2008
2008
2022
2022

Publication Types

Select...
6
1

Relationship

2
5

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 15 publications
0
4
0
Order By: Relevance
“…4 shows another typical distribution network i.e., an underground-and-overhead-intermingled distribution network model [6] which consists of 3 distribution substations, 53 root feeders and 266 sectionalizing switches (total load of all sections is 31.97 MW). Table 2, Figs.…”
Section: Evaluation Using the Exact Determination Methods (1) Results mentioning
confidence: 99%
“…4 shows another typical distribution network i.e., an underground-and-overhead-intermingled distribution network model [6] which consists of 3 distribution substations, 53 root feeders and 266 sectionalizing switches (total load of all sections is 31.97 MW). Table 2, Figs.…”
Section: Evaluation Using the Exact Determination Methods (1) Results mentioning
confidence: 99%
“…Figure 6 shows an underground-overhead-intermingled distribution network model composed of three distribution substations (omitted from the figure), 53 feeding points, and 266 switches. This model is made by referring to actually operating underground and overhead distribution networks in Japan [10,38]. In Japan, underground distribution networks normally have simple structures such as two-sectionalized and two-connected structure, while structures of overhead networks are complicated.…”
Section: Underground-overhead-intermingled Modelmentioning
confidence: 99%
“…Figure 5 illustrates an actual-scale distribution network model, which was made by referring to an actual operating underground and overhead intermingled distribution network in Japan [37,39]. This model can be divided into groups as described in Subsection 4.1, and thus the enumeration-based method was used to solve both of the problems in the traditional and proposed frameworks.…”
Section: Numerical Simulationsmentioning
confidence: 99%