2021
DOI: 10.1016/j.segan.2021.100526
|View full text |Cite
|
Sign up to set email alerts
|

A robust optimization framework for energy hub operation considering different time resolutions: A real case study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 21 publications
(7 citation statements)
references
References 34 publications
0
7
0
Order By: Relevance
“…Robust optimization approaches have been provided in [29,30] for optimal operation and scheduling of MCESs in an uncertain condition of renewable energy and electricity prices and gas fuel consumption by gas-fired units considering DR programs.…”
Section: Multi-carrier Energy Systemsmentioning
confidence: 99%
“…Robust optimization approaches have been provided in [29,30] for optimal operation and scheduling of MCESs in an uncertain condition of renewable energy and electricity prices and gas fuel consumption by gas-fired units considering DR programs.…”
Section: Multi-carrier Energy Systemsmentioning
confidence: 99%
“…Several articles have only taken into account the uncertainty of the renewable energy sources, i.e., wind power and PV generation [104], [115], [124]. In addition, [80] utilized classic RO to deal with the uncertainty of PV generation in a real case study. Other studies have only focused on the uncertainty of the electricity market prices e.g.…”
Section: ) Classic Romentioning
confidence: 99%
“…In this study, Information-gap Decision Theory (IGDT) and risk measures are considered for better decision-making in energy generation with diverse levels of risk values. The energy optimization of a hospital building in the energy hub in Iran with consideration of the solar irradiance and wind speed uncertainties by robust approach is implemented in [28]. The bi-level optimization approach for energy scheduling and optimal bidding is modeled in [29] with optimal performance of the compressed air energy storage and cascaded consumption of heat in an energy hub.…”
Section: Related Studiesmentioning
confidence: 99%