1998
DOI: 10.1016/s0378-7796(97)01226-1
|View full text |Cite
|
Sign up to set email alerts
|

A reliability approach to transmission expansion planning using fuzzy fault-tree model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
25
0

Year Published

2008
2008
2019
2019

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 58 publications
(29 citation statements)
references
References 8 publications
0
25
0
Order By: Relevance
“…Line_Loading ≤ LL max (8) Where (i, j) ∈ Ω and: S = Branch-node incidence matrix In this study, the objective function was different from those which were considered in [1][2][3][4][5][6][7][8][9][10][11][12][13][14][15][16][17][18][19][20][23][24][25][26][27]29,30] and in part of the problem constraints, ij f is considered as an additional constraint. In addition to the abovementioned changes, also Line_Loading constraint was considered as a new constraint in order to ensure adequacy of the network after expansion.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…Line_Loading ≤ LL max (8) Where (i, j) ∈ Ω and: S = Branch-node incidence matrix In this study, the objective function was different from those which were considered in [1][2][3][4][5][6][7][8][9][10][11][12][13][14][15][16][17][18][19][20][23][24][25][26][27]29,30] and in part of the problem constraints, ij f is considered as an additional constraint. In addition to the abovementioned changes, also Line_Loading constraint was considered as a new constraint in order to ensure adequacy of the network after expansion.…”
Section: Methodsmentioning
confidence: 99%
“…Some of this researches such as [1][2][3]6,[8][9][10][11][12][13][14][15][16][17][18][19][20][21][22][23][24] were related to problem solution method. Some others proposed different approaches for solution of this problem considered various parameters such as uncertainty in demand [5] , reliability criteria [4,25,26] and economic factors [27] . Also, some of them investigated this problem and generation expansion planning together [28,29] .…”
Section: Introductionmentioning
confidence: 99%
“…This tumble and swim make one chemo tactic step. If the concentration is greater at next location then they take another step in that direction [10][11] [12]. When concentration at next location is lesser that of previous location they tumble to find another direction and swim in this new direction.…”
Section: Bacterial Foragingmentioning
confidence: 99%
“…Papers that consider only investment/construction cost as an objective are: The simulated annealing (SA) [10], method has been successfully applied to large-scale TNEP problem. The SA [12] tries to avoid local optima by allowing temporary, limited deterioration of actual solutions.…”
Section: Introductionmentioning
confidence: 99%
“…Most commonly used reliability study methods for power system include Reliability Block Diagram (RBD) [2], Markov chain [3], Monte Carlo simulation [4] and Fault Tree Analysis (FTA) [5]. Considering the feature of industrial grids, for example, multi-input and multi-output, large quantity of components, known electrification scheme, desiring to identify key component(s) with biggest impact on the entire system reliability, as well as for the purpose of reflecting reliability trend after introducing VFDs, FTA is chosen in this paper to develop a generic evaluation algorithm.…”
Section: Introductionmentioning
confidence: 99%