2012 IEEE Symposium on Business, Engineering and Industrial Applications 2012
DOI: 10.1109/isbeia.2012.6423018
|View full text |Cite
|
Sign up to set email alerts
|

A preliminary study of the subcontractor's risk identification for the construction projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…Small variations of some uncertain factors such as load may affect the mechanical properties of structure significantly just because it has a bad topology configuration and an inappropriate prestress. For example, the unreasonable structure members arrangement of Malaysian Abidin Stadium leaded to a sudden collapse just under normal loads [1]. To get better topology configuration and prestress through robustness based structure design is an effective way to solve the problem of disproportionate damage issues caused by uncertainty [2].…”
Section: Introductionmentioning
confidence: 99%
“…Small variations of some uncertain factors such as load may affect the mechanical properties of structure significantly just because it has a bad topology configuration and an inappropriate prestress. For example, the unreasonable structure members arrangement of Malaysian Abidin Stadium leaded to a sudden collapse just under normal loads [1]. To get better topology configuration and prestress through robustness based structure design is an effective way to solve the problem of disproportionate damage issues caused by uncertainty [2].…”
Section: Introductionmentioning
confidence: 99%