A novel two-stage Lagrangian decomposition approach for refinery production scheduling with operational transitions in mode switching

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
3
0
1

Year Published

2017
2017
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 18 publications
0
3
0
1
Order By: Relevance
“…For this reason the decomposition based algorithms like Lagrangian relaxation, Bender's decomposition, etc. have been used to solve some larger than small sized instances of such problems (see Chu and You, 2013;Parastegari et al, 2013;Xiao et al, 2015;Shi et al, 2015;Wolosewicz et al, 2015). On the other hand, to tackle the large and very large instances of these problems the researchers have applied meta-heuristic algorithms.…”
Section: Introductionmentioning
confidence: 99%
“…For this reason the decomposition based algorithms like Lagrangian relaxation, Bender's decomposition, etc. have been used to solve some larger than small sized instances of such problems (see Chu and You, 2013;Parastegari et al, 2013;Xiao et al, 2015;Shi et al, 2015;Wolosewicz et al, 2015). On the other hand, to tackle the large and very large instances of these problems the researchers have applied meta-heuristic algorithms.…”
Section: Introductionmentioning
confidence: 99%
“…Table 4, classifies the works reviewed according to supply chain optimization topics. (Chandra, 1993), (Stacey et al,2007) x x (Martin et al,1993), (Fumero & Vercellis, 1999), (Timpe & x x x Kallrath, 2000), (Lei et al,2006), (Shiguemoto & Armentano, 2010), (Fahimnia et al,2015) (Fisher & Chandra, 1994), (Chen & Wang, 1997), (Sakawa et al,2001), (Ryu et al,2004), (Bertazzi et al,2005), (Oh & Karimi, 2006), (Roghanian et al,2007), (Park(a), 2007), (Dhaenens-Flipo & Finke, 2001), (Liang, 2007), (Boudia(a) et al, 2007), (Selim et al,2008), (Boudia (a) (Archetti et al, 2011), (Armentanoa et al,2011), (Chen et al,2009), (Amorim et al,2013), (Bilgen & Çelebi, 2013), (Nasiri et al,2014), (Adulyasak et al,2014) x x (Mcdonald & Karimi, 1997), (Gupta & Maranas, 2003), (Torabi & Hassini, 2008), (Khakdaman et al,2014), (Leung & Chan, 2009), (Mirzapour et al,2011, (Brahimia & Aouamb, 2015), (Shi et al,...…”
Section: Review Of the Work According To "Supply Chain Optimization mentioning
confidence: 99%
“…Shi et al (2014) presented a MILP discrete-time refinery scheduling model, establishing several controllable and realizable operation modes for production units by unitwide predictive control. And a two-stage Lagrangian decomposition approach was applied to decompose a refinery scheduling problem (Shi et al 2015). However, it is difficult to apply these methods above in dealing with scheduling of oil depots considering the special technological constraints for contaminated oil processing.…”
Section: Related Workmentioning
confidence: 99%