This paper models and solves the scheduling problem of cable manufacturing industries that minimizes the total production cost, including processing, setup, and storing costs. Two hybrid meta-heuristics, which combine simulated annealing and variable neighbourhood search algorithms with tabu search algorithm, are proposed. Applying some case-based theorems and rules, a special initial solution with optimal setup cost is obtained for the algorithms. The computational experiments, including parameter tuning and final experiments over the benchmarks obtained from a real cable manufacturing factory, show superiority of the combination of tabu search and simulated annealing comparing to the other proposed hybrid and classical meta-heuristics.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.