A note on the paper by M. A. Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
32
0
1

Year Published

2009
2009
2021
2021

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 44 publications
(34 citation statements)
references
References 4 publications
0
32
0
1
Order By: Relevance
“…The authors proposed the total sum of the free slacks as the measure of robustness and presented a biobjective model that maximizes robustness along with minimization of makespan. Kobyalanksy and Kutcha [111] proposed a modification on the mentioned model and established that a robust schedule is that which maximizes the free slack/activity duration ratio. Chtourou and Haouari [112] proposed 12 different robustness measures based on activity slack.…”
Section: Robustnessmentioning
confidence: 99%
“…The authors proposed the total sum of the free slacks as the measure of robustness and presented a biobjective model that maximizes robustness along with minimization of makespan. Kobyalanksy and Kutcha [111] proposed a modification on the mentioned model and established that a robust schedule is that which maximizes the free slack/activity duration ratio. Chtourou and Haouari [112] proposed 12 different robustness measures based on activity slack.…”
Section: Robustnessmentioning
confidence: 99%
“…Depending on the type of robustness being analysed, robustness measures used in the research may be divided into quality robustness measures and solution robustness measures [25].…”
Section: Measures Of Robustnessmentioning
confidence: 99%
“…The even distribution of buffers throughout the schedule is striven at (the idea akin to the one proposed by Kobylański and Kuchta (2007). For instance (the importance of instability cost for a given activity having been neglected): an increase in the time buffer bB i before an activity for which bB i = 0 instead of before an activity for which bB i = 2, increases the value of the objective function by the factor of 3 a .…”
Section: Buffer Allocation Algorithm For the Problem Of Timely Milestmentioning
confidence: 99%
“…In numerous survey papers (Aytug et al, 2005;Herroelen and Leus, 2004;Klimek and Łebkowski, 2007;Van De Vonder, 2006;Vieira et al, 2003), the authors have attempted to structure the research in project scheduling under uncertain conditions. Project scheduling most often includes an analysis of uncertainty pertaining to the activity duration time (Herroelen and Leus, 2004;Kobylański and Kuchta, 2007;Lambrechts et al, 2006;Leus, 2003;Van de Vonder et al, 2005;Van de Vonder et al, 2006;Van De Vonder, 2006). It is assumed that numerous other disturbances (including adverse weather conditions, resource unavailability, irregularities in material supplies etc.)…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation