Urbanization Challenges in Emerging Economies 2018
DOI: 10.1061/9780784482032.002
|View full text |Cite
|
Sign up to set email alerts
|

A Modeling Approach to Construction Waste Management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
2

Relationship

1
5

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 10 publications
0
3
0
Order By: Relevance
“…PLS-SEM is mainly used to confirm the reliability of the sample data from two aspects: firstly, it is the indicator reliability, which is evaluated by the Factor Loading; second, it is the internal consistency of the indicator data, which is mainly measured by the compositional reliability 41,42 and Cronbach's alpha (CA). The validity analysis mainly includes convergent validity and discriminant validity analysis, and the convergent validity of the model can be estimated by calculating the average variance extracted (AVE) 12 value.…”
Section: The Measurement Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…PLS-SEM is mainly used to confirm the reliability of the sample data from two aspects: firstly, it is the indicator reliability, which is evaluated by the Factor Loading; second, it is the internal consistency of the indicator data, which is mainly measured by the compositional reliability 41,42 and Cronbach's alpha (CA). The validity analysis mainly includes convergent validity and discriminant validity analysis, and the convergent validity of the model can be estimated by calculating the average variance extracted (AVE) 12 value.…”
Section: The Measurement Modelmentioning
confidence: 99%
“…Collected data were analyzed to test whether there were differences in recordable incident rates and lost time work rates between green and nongreen projects. In addition, Olanipekun and coworkers [9][10][11][12][13] conducted analyses of key factors of project management environmental performances from a perspective of construction engineering firms and identified 19 controllable project management factors from relevant literature.…”
Section: Introductionmentioning
confidence: 99%
“…It is found that management showed less interest about waste minimization compared to the construction workforce (Lingard et al, 2000), and architects are not aware of either waste minimization or design waste (Osmani et al, 2008). Modeling of factors effecting construction waste by means of structural equation modeling is used to assess direct and indirect relationships between variables (Kolaventiet et al, 2018).…”
Section: Literature Reviewmentioning
confidence: 99%