2020
DOI: 10.1088/1742-6596/1529/5/052054
|View full text |Cite
|
Sign up to set email alerts
|

A Mini Comparative Study of Requirements Modelling Diagrams towards Swimlane: Evidence of Enterprise Resource Planning System

Abstract: Model-based requirements engineering (MBRE) is an approach that empowers requirements engineers with adequate models to perform requirements engineering (RE) activities. This approach is increasingly becoming an essential part of system engineering projects as it reduces development time, enhances analysis capability and increases the potential for reuse. Use case diagram, activity diagram, business process management and notation diagram (BPMN) and swimlane diagram are among the diagram used in representing t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 12 publications
0
2
0
1
Order By: Relevance
“…Diagram swimlane merupakan alat yang biasa digunakan untuk memodelkan proses bisnis [9]. Diagram ini menunjukan hubungan dari beberapa proses dengan menggunakan panah dan memberi tambahan dimensi dengan memetakan tiap proses ke kategori tertentu [10] Pada penelitian yang dilakukan di industri mainan kayu, ada risiko terjadinya keterlambatan jadwal pengiriman material, supplier tidak dapat memenuhi kebutuhan material, kesalahan prosedur pemeriksaan, dan kesalahan perhitungan kebutuhan material [11]. Metode HOR (House of Risk) digunakan untuk menyelesaikan permasalahan tersebut.…”
Section: Gambar 1 Lead Time Customer Terima Barang -Pembayaran Tahun ...unclassified
“…Diagram swimlane merupakan alat yang biasa digunakan untuk memodelkan proses bisnis [9]. Diagram ini menunjukan hubungan dari beberapa proses dengan menggunakan panah dan memberi tambahan dimensi dengan memetakan tiap proses ke kategori tertentu [10] Pada penelitian yang dilakukan di industri mainan kayu, ada risiko terjadinya keterlambatan jadwal pengiriman material, supplier tidak dapat memenuhi kebutuhan material, kesalahan prosedur pemeriksaan, dan kesalahan perhitungan kebutuhan material [11]. Metode HOR (House of Risk) digunakan untuk menyelesaikan permasalahan tersebut.…”
Section: Gambar 1 Lead Time Customer Terima Barang -Pembayaran Tahun ...unclassified
“…In our application our clients were not accustomed to using any of the common standard languages so we developed a stripped down version of the Arena ® domain specific language [78] (Figure 14). Introducing a standard modelling languages as BPMN [79,80] or sysML [78,81] would have introduced and added an unnecessary cognitive, which we opted to avoid. In any case, as the specific languages used for the DM is not central to the framework, the user may choose freely.…”
Section: Modelling Languagementioning
confidence: 99%
“…For example, a sequence diagram that represents some requirement does not distinguish between existing and required objects, messages, and sequences. A more recent approach studies the limitations of Use Case Diagrams, and explored UML Swimlane ADs in the context of business process modeling for MBRE [23]. Similarly, the framework is not suited to specify which portions of the specification constitute the reference for the requirement.…”
Section: Related Workmentioning
confidence: 99%