2017
DOI: 10.1007/978-981-10-6205-6_6
|View full text |Cite
|
Sign up to set email alerts
|

A MCDM-NBO Approach for Selection of Installation Location for Wave Energy Power Plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
11
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(11 citation statements)
references
References 26 publications
0
11
0
Order By: Relevance
“…For example, the criteria weights are equal in the case of a symmetrical evaluation [10]. The mathematical background of this disadvantage is related to the weighting process steps of the DEMATEL method [11]. On the other hand, the steps of TOPSIS technique help to solve this problem.…”
Section: Introductionmentioning
confidence: 99%
“…For example, the criteria weights are equal in the case of a symmetrical evaluation [10]. The mathematical background of this disadvantage is related to the weighting process steps of the DEMATEL method [11]. On the other hand, the steps of TOPSIS technique help to solve this problem.…”
Section: Introductionmentioning
confidence: 99%
“…It is recommended to use diesel generators with a minimum load of not less than, usually, 40 percent to maintain high efficiency (efficiency), since fuel costs can be significant, which will be expensive, and to minimize machine wear (Kaiser and Snyder, 2012a;Bukar et al, 2019;Rehman et al, 2019). However, given that the load is continually changing and the need to match the load, in many areas, you can find diesels that have the appropriate capacity or are inefficiently used (Chakraborty, 2018). This quite often happens with diesels, for which the operational demands are not fulfilled.…”
Section: Introductionmentioning
confidence: 99%
“…In recent years many studies have adopted this method of utilizing MCDM and PNN in cognition to monitor or estimate performance of the renewable power plants, location selection etc. with satisfactory results.…”
Section: Introductionmentioning
confidence: 99%
“…In most of the studies Analytical Hierarchy Process and its modified variants were utilized as the MCDM method . In few studies Analytical Network Process and DEMATEL were also utilized. In the present study MACBETH method was used for the first time to estimate the significance of each indicator of representing the reliability of hydropower plant with respect to the objective of the decision‐making process.…”
Section: Introductionmentioning
confidence: 99%