2006
DOI: 10.3182/20060830-2-sf-4903.00021
|View full text |Cite
|
Sign up to set email alerts
|

A Lsis Case Study: Computer Integrated Manufacturing and Management Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2008
2008
2023
2023

Publication Types

Select...
7
2

Relationship

5
4

Authors

Journals

citations
Cited by 14 publications
(6 citation statements)
references
References 8 publications
0
6
0
Order By: Relevance
“…Possible hardware and software structures were analysed and found useful for actual applications , Lewoc et al 2006d.…”
Section: Resultsmentioning
confidence: 99%
“…Possible hardware and software structures were analysed and found useful for actual applications , Lewoc et al 2006d.…”
Section: Resultsmentioning
confidence: 99%
“…Stapleton, 2008) and even is being designed and investigated for the future (the Computer Integrated Manufacturing and Management systems (CIMMs), ref. Franasik, 2001;Izworski, 2003Izworski, , 2006Lewoc, 2006a). It is only a big pity that, after the most desirable political changes in the case study country, the large scale technology transfer that has become possible, results rather in losses than in technological development ( Izworski, 2001;Lewoc 2005Lewoc ,2006bLewoc , 2007a.…”
Section: Final Remarksmentioning
confidence: 99%
“…The article presents the notion of CIMMs Franasik et al (2001), some basic information about the general topologies of CIMMs [2][3][4][5] Izworski et al (2003b, c), Lewoc et al (2006a), Lewoc et al (2009), determined on the basis of robustness evaluation (µ-function), a proposal of the optimal network topology assuming democratic character of the network, proven for the initial network data. Some hypotheses for more general networks are also given.…”
Section: Introductionmentioning
confidence: 99%