2008
DOI: 10.3182/20080706-5-kr-1001.01131
|View full text |Cite
|
Sign up to set email alerts
|

Power Industry Computer Control System Design and Implementation Problems: A Case Study of Poland

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2008
2008
2015
2015

Publication Types

Select...
3
2

Relationship

2
3

Authors

Journals

citations
Cited by 13 publications
(7 citation statements)
references
References 11 publications
0
7
0
Order By: Relevance
“…The team, basing on the biggest experience available in the country [Han, Lewoc, Izworski et al 2008;Lewoc et al 2008;Lewoc, Izworski, Skowroński et al 2011a;Lewoc, Izworski, Skowroński 2011b], formulated and adopted a good design practice as follows:…”
Section: Basic Requirements For the Communication Networkmentioning
confidence: 99%
“…The team, basing on the biggest experience available in the country [Han, Lewoc, Izworski et al 2008;Lewoc et al 2008;Lewoc, Izworski, Skowroński et al 2011a;Lewoc, Izworski, Skowroński 2011b], formulated and adopted a good design practice as follows:…”
Section: Basic Requirements For the Communication Networkmentioning
confidence: 99%
“…In spite of severe technical, social and political problems [1] and due to the solutions devised by the design and implementation team [2], the first successful version of SAPI ODM was implemented in the Central Power Industry Region in 1976. The two next versions were implemented in the Western and Eastern Regions; in addition, one big lower level power control centre was automated using the SAPI ODM solutions.…”
Section: Sapi Odmmentioning
confidence: 99%
“…However, when developing SAPI ODM, a very good solution (at least, as for that time) was designed and implemented [1], the importation barriers in the case study country were a severe limitation for the cluster control unit. Therefore, it was decided to develop a home solution for the power industry visualisation systems.…”
Section: Intelligent Cluster Control Unitmentioning
confidence: 99%
See 1 more Smart Citation
“…Argadona 2003;Bulz 2010, personal communication;Bulz et al 2009;Bynum 2000;Dimirovski 2001;Hersh 2001a, b;Hersh et al 2005;Jancev and Cernetic 2001;Magebheim and Schulte 2006;Nordkvelle and Olson 2005;Stahk 2009;Tavani 2001). The problems of ethics in ICT and automation in Poland have been discussed by Lewoc et al(2005Lewoc et al( , 2006aLewoc et al( , b, 2008aLewoc et al( , 2009Lewoc et al( , 2010aLewoc et al( , 2011a, Izworski et al (2001) and Han et al (2008). This involved the investigation of ethical issues through consideration of the experiences of actual Polish pioneers in ICT and automation.…”
Section: Introductionmentioning
confidence: 99%