2020
DOI: 10.1088/1757-899x/960/3/032007
|View full text |Cite
|
Sign up to set email alerts
|

A Hybrid Construction Method for Shallow Buried Urban Tunnel with Ultra-Small Clear Distance

Abstract: During the construction process, it is difficult to ensure the structural safety of shallow buried tunnel with the ultra-small clear distance since the tunnel is prone to instability and the surrounding rock and soil are in an adverse stress condition. To address this issue, a hybrid construction method is proposed to enhance tunnel stability and reinforce the surrounding rocks and soil. First, aiming at an actual tunnel, numerical analysis are provided to compare the effectiveness of different construction me… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…Zhang et al [21] used Ansys finite element software to study the excavation sequence problem of a shallow-buried asymmetrical loading small clearance tunnel under different conditions and came up with a reasonable excavation sequence for different spacing, slope, and burial depth. Xu et al [22] proposed a hybrid construction method for a small clear-distance tunnel and compared it with the CRD construction method using numerical simulation to verify the effectiveness of the hybrid construction method. Wang et al [4] conducted a numerical simulation of the whole process for a shallow-buried, large-span, double-arch tunnel under the faulted and broken zone of the highway.…”
Section: Introductionmentioning
confidence: 99%
“…Zhang et al [21] used Ansys finite element software to study the excavation sequence problem of a shallow-buried asymmetrical loading small clearance tunnel under different conditions and came up with a reasonable excavation sequence for different spacing, slope, and burial depth. Xu et al [22] proposed a hybrid construction method for a small clear-distance tunnel and compared it with the CRD construction method using numerical simulation to verify the effectiveness of the hybrid construction method. Wang et al [4] conducted a numerical simulation of the whole process for a shallow-buried, large-span, double-arch tunnel under the faulted and broken zone of the highway.…”
Section: Introductionmentioning
confidence: 99%