2009 International Joint Conference on Computational Sciences and Optimization 2009
DOI: 10.1109/cso.2009.33
|View full text |Cite
|
Sign up to set email alerts
|

A Fuzzy Reputation Based Ant Algorithm for Grid Scheduling

Abstract: Efficient algorithms for scheduling the resources to successfully execute the tasks submitted by the users are of great importance in dynamic environments like Grid. In this paper, a grid scheduling is proposed using Ant Colony Optimization(ACO) algorithm and Fuzzy Reputation(FR) Aggregation to improve the decision of scheduling. Empirical results show that this method can improve the velocity of execution by taking advantage of historical information and nodes' information. The using of our Fuzzy Reputation-b… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 3 publications
(2 reference statements)
0
3
0
Order By: Relevance
“…A fuzzy reputation-based ant algorithm for Grid scheduling has been designed in [42]. A fuzzy logic trust model for trust value aggregation through fuzzification has been used.…”
Section: Resource Scheduling With Securitymentioning
confidence: 99%
“…A fuzzy reputation-based ant algorithm for Grid scheduling has been designed in [42]. A fuzzy logic trust model for trust value aggregation through fuzzification has been used.…”
Section: Resource Scheduling With Securitymentioning
confidence: 99%
“…Other proposals have involved distributed solutions that use intelligent agents, ant colonies, genetic algorithms, etc. For example, [24] proposes a scheduling algorithm using ant colonies based on a node reputation fuzzy model to make better decisions. The algorithm proposed in [25] is focused on monitoring resources to distribute tasks by balancing and adjusting the load at the nodes.…”
Section: Existing Approaches To the Grid Scheduling Problemmentioning
confidence: 99%
“…Authors illustrated that GA performs better than TS and SA for scheduling of the jobs to exact resources but hybrid heuristic algorithms perform better than GA approach as it minimizes the time required for scheduling the job [5]. A fuzzy reputation based ant algorithm for Grid scheduling has been designed in [14]. Authors used fuzzy logic trust model for trust value aggregation through fuzzification.…”
Section: Related Workmentioning
confidence: 99%