A framework to identify Pareto‐efficient subdaily environmental flow constraints on hydropower reservoirs using a grid‐wide power dispatch model

Abstract: Hydrologic alteration due to hydropeaking reservoir operations is a main concern worldwide. Subdaily environmental flow constraints (ECs) on operations can be promising alternatives for mitigating negative impacts. However, those constraints reduce the flexibility of hydropower plants, potentially with higher costs for the power system. To study the economic and environmental efficiency of ECs, this work proposes a novel framework comprising four steps: (i) assessment of the current subdaily hydrologic alterat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
28
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 35 publications
(32 citation statements)
references
References 41 publications
1
28
0
Order By: Relevance
“…This coupling is required because the Rapel hydropower plant is part of Chile's Central Interconnected Power System (SIC), organized as a mandatory pool with audited costs. Thus, the operation of all power plants in central Chile is prescribed by an independent system operator (ISO) following a cost-minimization criterion of the entire power system [5,12]. The following subsections detail this coupling.…”
Section: Methodsmentioning
confidence: 99%
See 4 more Smart Citations
“…This coupling is required because the Rapel hydropower plant is part of Chile's Central Interconnected Power System (SIC), organized as a mandatory pool with audited costs. Thus, the operation of all power plants in central Chile is prescribed by an independent system operator (ISO) following a cost-minimization criterion of the entire power system [5,12]. The following subsections detail this coupling.…”
Section: Methodsmentioning
confidence: 99%
“…MIP-UC minimizes the operational costs of the power system (composed of thermal, hydro and renewable power plants) while satisfying the energy demand of each node and a set of technical constraints. A detailed formulation of the MIP-UC model can be found in previous studies [12].…”
Section: Power System Operationsmentioning
confidence: 99%