2009
DOI: 10.1016/j.infsof.2008.10.001
|View full text |Cite
|
Sign up to set email alerts
|

A framework for developing measurement systems and its industrial evaluation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
33
1

Year Published

2010
2010
2022
2022

Publication Types

Select...
4
3
1

Relationship

3
5

Authors

Journals

citations
Cited by 74 publications
(35 citation statements)
references
References 22 publications
1
33
1
Order By: Relevance
“…The organization uses a number of measurement systems for controlling the software development project (per project) described above, a number of measurement systems to control the quality of products in field (per product) and a measurement system for monitoring the status of the organization at the top level. All measurement systems are developed using the in-house methods described in [SMN08], with the particular emphasis on models for design and deployment of measurement systems presented in [SM09c]. The needs of the organization evolved from metrics calculations and presentations (ca.…”
Section: Value Propositionsmentioning
confidence: 99%
See 2 more Smart Citations
“…The organization uses a number of measurement systems for controlling the software development project (per project) described above, a number of measurement systems to control the quality of products in field (per product) and a measurement system for monitoring the status of the organization at the top level. All measurement systems are developed using the in-house methods described in [SMN08], with the particular emphasis on models for design and deployment of measurement systems presented in [SM09c]. The needs of the organization evolved from metrics calculations and presentations (ca.…”
Section: Value Propositionsmentioning
confidence: 99%
“…A gadget is used as a placeholder for the content on the stakeholders' computer, but the information itself is served through the metric infrastructure [SMN09]. An example of such a gadget is presented in fig.…”
Section: On-demand Delivery -Ms Sidebar Gadgetsmentioning
confidence: 99%
See 1 more Smart Citation
“…Indeed, it must address the following requirements: the automation of measurement, the integration into a modeling tool, the need for extensibility and tailoring, etc. In all, the order of magnitude of the cost of model measurement software is several man-months [28,50].…”
Section: Introductionmentioning
confidence: 99%
“…Several (Abran et al, 2003;Staron, Meding, & Nilsson, 2009) have studied differences in these standards, some (Bundschuh & Dekkers, 2008;García et al, 2006;García et al, 2009) 4.33, 20926:2003, 14598-1:1999, 24765, 14102:1995, 15939:2002, 19500-2:2003, 19761:2003, and IEEE standards (Bundschuh & Dekkers, 2008.…”
Section: Iso and Ieee Standardsmentioning
confidence: 99%