2013
DOI: 10.1007/s10664-013-9241-4
|View full text |Cite
|
Sign up to set email alerts
|

A flexible method to estimate the software development effort based on the classification of projects and localization of comparisons

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
24
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 50 publications
(27 citation statements)
references
References 53 publications
1
24
0
Order By: Relevance
“…To perform multiple linear regression analysis, the β-value (the regression coefficient) was used to verify if the independent variables had explanatory power (Park et al, 2020). In this work we used the stepwise mode of regression analysis, which is indicated when multiple independent variables are taken as predictors (Shepperd and MacDonell, 2012;Bardsiri et al, 2014). The stepwise regression technique aims to maximize the estimated power with a minimum number of independent variables.…”
Section: Discussionmentioning
confidence: 99%
“…To perform multiple linear regression analysis, the β-value (the regression coefficient) was used to verify if the independent variables had explanatory power (Park et al, 2020). In this work we used the stepwise mode of regression analysis, which is indicated when multiple independent variables are taken as predictors (Shepperd and MacDonell, 2012;Bardsiri et al, 2014). The stepwise regression technique aims to maximize the estimated power with a minimum number of independent variables.…”
Section: Discussionmentioning
confidence: 99%
“…The ATLM proposed by Whigham et al 10 is a baseline model in SEE developed using multiple linear regression. Whigham et al 10 compared ATLM to other complex models such as ensemble methods 4 and a hybrid approach (incorporating particle swarm optimization, analogy‐based estimation, and clustering 67 ).…”
Section: Methodsmentioning
confidence: 99%
“…Dataset segmentation omits inconsistent projects and improves estimation accuracy as was described by Bardisiri et al [7]. Both [17,18] present the usage of the particle swarm optimization algorithm.…”
Section: Related Workmentioning
confidence: 97%