Developments made in the fifth generation (5G) and the cellular networks have greatly influenced the lifestyle of the wireless users. Increased demand on higher data rates has also increased the network traffic. In the viewpoint of cellular networks, several Small Cells (SCs) are combined together with the help of microwave communications and millimeter wave communication models, in order to support the heterogeneous environments. In this paper, we have proposed a hybrid communication framework which can efficiently support the interference management, routings in backhaul links and the joint issue during on/off status of the mobile using 5G mmWave backhaul links. A novel cache-enabled technology is designed to develop backhaul links using heuristic search models. Along with that, an effective data access framework is also formulated using distance based cluster head selection that resolves the interference issues. Without modifying the content of the mobile users, the services are offered to the uses associated with backhaul links. Since a fast iterative model is developed, the throughput rate and the energy savings are maximized. A simulation analysis is carried out with a static number of mobile nodes which has proved the efficiency of the proposed framework.
Keywords5G networks, Millimeter wave (mm wave) • BackHaul routing • Cache-enabled technologies and interference management * L. Manjunath