2015
DOI: 10.1109/tpwrs.2014.2357816
|View full text |Cite
|
Sign up to set email alerts
|

A Convex Model of Risk-Based Unit Commitment for Day-Ahead Market Clearing Considering Wind Power Uncertainty

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
48
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 128 publications
(55 citation statements)
references
References 36 publications
0
48
0
Order By: Relevance
“…In [10], the pre-contingency cost of security constraints is minimized. In [11], the risk of expected-energy-not-served and WPC are modeled based on the PDF of RD and included in both the operational cost and the constraints. These works only model one of the risk constraints, those are, expected-energynot-served, WPC, and contingency constraints.…”
Section: B Operational Risk Objective Functionmentioning
confidence: 99%
See 2 more Smart Citations
“…In [10], the pre-contingency cost of security constraints is minimized. In [11], the risk of expected-energy-not-served and WPC are modeled based on the PDF of RD and included in both the operational cost and the constraints. These works only model one of the risk constraints, those are, expected-energynot-served, WPC, and contingency constraints.…”
Section: B Operational Risk Objective Functionmentioning
confidence: 99%
“…However, there is a chance of losing information during scenario reduction. In [11], a risk-based UC formulation is presented to incorporate the risks of the expected-energy-not-served, WPC and branch overflow affected by wind power uncertainty, while neglecting the re-dispatch of conventional TUs for wind power forecasting errors in power flow calculation process. In [12], a chance-constrained programming for handling costbased UC and modeling the day-ahead probability distribution function (PDF) of RD comprising of the WPC influence is presented.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Risk-based optimization technique- [102,103] Interval optimization method- [101] Robust optimization method- [ …”
Section: Ssm Reactive Power Management-[113]mentioning
confidence: 99%
“…Non-deterministic UC can be divided into four different categories depending on the way in which they address the uncertainty: stochastic programming [90][91][92][93], robust optimization [99,100], interval optimization [101], and risk-based optimization [102,103].…”
Section: Ssm In Isolated Systemsmentioning
confidence: 99%