2014
DOI: 10.1007/s10846-014-0123-9
|View full text |Cite
|
Sign up to set email alerts
|

A Conceptual Framework of Quality-Assured Fabrication, Delivery and Installation Processes for Liquefied Natural Gas (LNG) Plant Construction

Abstract: Construction productivity issues in the Liquefied Natural Gas (LNG) construction industry can lead to project cost blowouts. Time wasted by construction personnel getting the right information on megaprojects can be a substantial contributing factor. It appears that the communication on site is not cost effective, judging by the number of large project that have experienced budget overruns in the past. More importantly, as-built design documentation often fails the quality test, resulting in operational ineffi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0
1

Year Published

2015
2015
2022
2022

Publication Types

Select...
6
1

Relationship

3
4

Authors

Journals

citations
Cited by 16 publications
(8 citation statements)
references
References 42 publications
0
7
0
1
Order By: Relevance
“…Components produced by 3-D printer need to 451 be tested in relationship to building scale constraints as individually produced objects, then as 452 a complete assembly of objects (Sass and Oxman, 2006). BIM is an effective approach to 453 simulate the overall assembly process and detect potential assembly issues before real printing 454 (Zhang and Hu, 2011;Chi et al, 2014). Interaction between 3-D printing and BIM gives new meaning to systematic ways of analysing connection strength, printing methods, and appearance.…”
Section: -D Printing and Building Information Modelling (Bim)mentioning
confidence: 99%
“…Components produced by 3-D printer need to 451 be tested in relationship to building scale constraints as individually produced objects, then as 452 a complete assembly of objects (Sass and Oxman, 2006). BIM is an effective approach to 453 simulate the overall assembly process and detect potential assembly issues before real printing 454 (Zhang and Hu, 2011;Chi et al, 2014). Interaction between 3-D printing and BIM gives new meaning to systematic ways of analysing connection strength, printing methods, and appearance.…”
Section: -D Printing and Building Information Modelling (Bim)mentioning
confidence: 99%
“…x x x (Chi et al, 2015);(Trujens et al, 2014); (Xu et al, 2012) (Aveva, 2015; (Aveva, 2015,p.26-30); (Aveva, 2015,p.34-37); (Aveva, 2015,p.48-51); (Aveva, 2015,p.40-41); (Bentley, 2013,p.62); (Intergraph, 2013); (Intergraph, 2015) Gather; Generate Equipment management x x - (Bentley, 2015,p.13) Gather; Generate…”
Section: Geospatial Analysismentioning
confidence: 99%
“…Dentro dos estudos analisados no tema de RV/RA para o controle de qualidade foi possível observar uma tendência inicial para o uso desta tecnologia no controle das tarefas já executadas, ao final de seu processo (SIU e LU, 2011;CHI et al, 2015;TEZEL e AZIZ, 2017;ZHOUL et al, 2017), enquanto apenas um dos estudos utilizou a tecnologia para auxiliar o controle de qualidade durante o processo da construção (KWON et al, 2014). Apesar do pequeno número de pesquisas neste tema, existe uma lacuna de pesquisa sobre o uso desta tecnologia para melhorar o controle de qualidade da construção durante os seus processos.…”
Section: Discussionunclassified