A computational experiment to explore better robustness measures for project scheduling under two types of uncertain environments

Abstract: Highlights✓ A general framework of the slack-based surrogate robustness measures is proposed ✓ The best surrogate measures are found for two kinds of uncertain environments ✓ The improvement is 13.79% under the environment of stochastic activity durations ✓ The impact of parameters on the performance of the robustness measure is analyzed ✓ The time buffering strategies are different under the two uncertain environments 1 A computational experiment to explore better robustness measures for project scheduling un… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
11
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 36 publications
(17 citation statements)
references
References 32 publications
1
11
0
1
Order By: Relevance
“…Similar conclusions can be drawn from other review papers by Habibi, et al [44] and Kolisch and Hartmann [45]. Nature inspired metaheuristic algorithms such as (GA) [46], PSO [47], fruit-fly optimization algorithm [48] and SA [49] are a few of many approaches for solving SRCPSPs or uncertainty-based PSPs.…”
Section: A Existing Research On Srcpspsupporting
confidence: 77%
See 1 more Smart Citation
“…Similar conclusions can be drawn from other review papers by Habibi, et al [44] and Kolisch and Hartmann [45]. Nature inspired metaheuristic algorithms such as (GA) [46], PSO [47], fruit-fly optimization algorithm [48] and SA [49] are a few of many approaches for solving SRCPSPs or uncertainty-based PSPs.…”
Section: A Existing Research On Srcpspsupporting
confidence: 77%
“…Ma, et al [46] propose a proactive RCPSP policy after considering both stochastic resource availabilities and stochastic activity durations. They have emphasised the need to include time buffers based on uniform distributions, particularly if there is any chance of unreliable resource availability during project tenure.…”
Section: B Research On Rcpsp With Disruptions (Rcpspd)mentioning
confidence: 99%
“…In the proposed problem, the optimized objective is to maximize solution robustness 𝑅𝑜𝑏𝑢. Referred to [7]…”
Section: Problem Formulationmentioning
confidence: 99%
“…Equation ( 6) ensures that the duration of all the subactivities of activity 𝑖 must equal the expected duration of activity 𝑖. The constraints (7) guarantee that the number of splitting for a given divisible activity is no more than a predefined level called 𝜂 𝑖 , while in (8) the duration of each subactivity must be no smaller than its minimum continuous execution time. The inequalities in (9) represent the relationship between the variables 𝑥 𝑖 𝑣 ,𝑗 𝑓 ,𝑘 and 𝑦 𝑖 𝑣 ,𝑗 𝑓 ,𝑘 .…”
Section: Problem Formulationmentioning
confidence: 99%
“…Gonzalez-Ruiz et al, 2019 proposed a Stochastic Fuzzy Logistic Model for patterning the construction of integrated mutilates scenarios in the financing of infrastructure projects. Ma, Demeulemeester, He, and Wang, 2019 addressed the proactive resource-constrained project scheduling problem, for exploring the better surrogate robustness measures to generate robust baseline schedules under uncertain platforms.…”
Section: Introductionmentioning
confidence: 99%