Proceedings of the Creative Construction E-Conference 2020 2020
DOI: 10.3311/ccc2020-069
|View full text |Cite
|
Sign up to set email alerts
|

A Comprehensive Map for Integrating Augmented Reality During the Construction Phase

Abstract: The increased complexity of construction projects requires the involvement of a wide range of organizations throughout the project lifecycle-from conceptual planning to decommissioning. Construction project teams, therefore, differ from teams in other industries as they comprise individuals who are employed by organizations that conduct different businesses. These many separate organizations working together in a close harmony over the duration of the project is fundamental to the overall business of construct… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
5
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 20 publications
0
5
0
Order By: Relevance
“…Prior to the COVID-19 pandemic, there was a pressing need in the construction industry to increase productivity, improve project performance, address labor shortage, reduce fragmentation, introduce standardization, and increase collaboration (Oesterreich and Teuteberg, 2016;Barbosa et al, 2017;Nassereddine et al, 2020aNassereddine et al, , 2020bEl Jazzar et al, 2020aBou Hatoum et al, 2020;Hatoum and Nassereddine, 2020;Sawhney et al, 2020). In addition to that, the labor-intensive nature of construction projects and the dynamic nature of construction sites make the construction industry one of most hazardous industries in the world (OSHA, 2019;OSHA, 2020a;Eurostat, 2020;.…”
Section: Introductionmentioning
confidence: 99%
“…Prior to the COVID-19 pandemic, there was a pressing need in the construction industry to increase productivity, improve project performance, address labor shortage, reduce fragmentation, introduce standardization, and increase collaboration (Oesterreich and Teuteberg, 2016;Barbosa et al, 2017;Nassereddine et al, 2020aNassereddine et al, , 2020bEl Jazzar et al, 2020aBou Hatoum et al, 2020;Hatoum and Nassereddine, 2020;Sawhney et al, 2020). In addition to that, the labor-intensive nature of construction projects and the dynamic nature of construction sites make the construction industry one of most hazardous industries in the world (OSHA, 2019;OSHA, 2020a;Eurostat, 2020;.…”
Section: Introductionmentioning
confidence: 99%
“…Yet, the construction industry lags behind other major industries in its adoption of technological advances (Osunsanmi et al, 2018). Nassereddine et al (2020a) noted that the complex nature of the construction industry and its heavy reliance of information require the adoption of new and emerging technologies. Challenges facing the construction industry span a multitude of reasons including the daunting decline in productivity, shortage in the workforce, low levels of research and development (R&D), and the inefficient and insufficient transfer of knowledge from project to project (Sawhney et al, 2020;El Jazzar and Hamzeh, 2015;Eljazzar et al, 2013).…”
Section: Introductionmentioning
confidence: 99%
“…),Schranz et al (2020) andUrban et al (2019) listed different use-cases of AR throughout the construction project lifecycle. Several authors(Arashpour and Aranda- Mena, 2017;Calderon-Hernandez and Brioso, 2018;Schranz et al (2020)) discussed the applications of AR during design and planning Nassereddine, et al (2020a). mapped 23 use-cases of AR during the construction phase of the project.…”
mentioning
confidence: 99%
“…Yet, the construction industry lags behind other major industries in its adoption of technological advances (Osunsanmi et al, 2018). Nassereddine et al (2020a) noted that the complex nature of the construction industry and its heavy reliance of information require the adoption of new and emerging technologies. Challenges facing the construction industry span a multitude of reasons including the daunting decline in productivity, shortage in the workforce, low levels of research and development (R&D), and the inefficient and insufficient transfer of knowledge from project to project (Sawhney et al, 2020;El Jazzar and Hamzeh, 2015;Eljazzar et al, 2013).…”
Section: Introductionmentioning
confidence: 99%
“…),Schranz et al (2020) andUrban et al (2019) listed different use-cases of AR throughout the construction project lifecycle. Several authors(Arashpour and Aranda- Mena, 2017;Calderon-Hernandez and Brioso, 2018;Schranz et al (2020)) discussed the applications of AR during design and planning Nassereddine, et al (2020a). mapped 23 use-cases of AR during the construction phase of the project.…”
mentioning
confidence: 99%