2015
DOI: 10.1016/j.ress.2015.04.010
|View full text |Cite
|
Sign up to set email alerts
|

A cold standby repairable system with working vacations and vacation interruption following Markovian arrival process

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
20
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
6
2

Relationship

2
6

Authors

Journals

citations
Cited by 39 publications
(20 citation statements)
references
References 41 publications
(41 reference statements)
0
20
0
Order By: Relevance
“…From (17), it can be concluded that q =q. Therefore, from (16),w = w and, consequently, D 1 =D 1 and D 2 =D 2 .…”
Section: Definitionmentioning
confidence: 95%
“…From (17), it can be concluded that q =q. Therefore, from (16),w = w and, consequently, D 1 =D 1 and D 2 =D 2 .…”
Section: Definitionmentioning
confidence: 95%
“…(1) The distribution for the k th working period from the beginning up states We suppose the system is in up states (U states) at the beginning. Let ( 1) k W   be the state occupancy probability vector at the start of the k th working period,…”
Section: Some Sojourn Time Distributions For Mrs-hds With Neglected Fmentioning
confidence: 99%
“…Reliability is an important feature of repairable systems [1]- [4]. In most existing literatures, reliability analysis is studied by modeling the repairable system as a Markov process (e.g., see [5]- [7]).…”
Section: Introductionmentioning
confidence: 99%
“…Also, Liu et al [10] has studied the system reliability in a cold standby repairable system with working vacations and vacation interruptions, where a matrix-analytic method is applied to derive the several important performance measures. Then Ardakan and Hamadani [1] investigated the reliability of the series-parallel systems with mixed redundancy strategy including the active and cold-standby components.…”
Section: Introductionmentioning
confidence: 99%