A case study of using OLTC to mitigate overvoltage in a rural european low voltage network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 18 publications
(11 citation statements)
references
References 1 publication
0
10
0
Order By: Relevance
“…The authors of [3,5,9,10,14,24,44,48,[54][55][56][57][58][59][60][61][62][63][64] defined PV HC with reference to the peak load of the feeder as the ratio of the maximum capacity of the PV installation to the maximum load of the feeder. In [65], the authors investigated the HC of a rural European three-phase balanced system for two types of simulations that is one-time slot simulation and time series simulation and an estimated HC of 86% of peak load has been observed. Additionally, the HC based on the peak load of a real USA feeder is found to be 35% [7] and 86% HC value is noticed for an 11.4 kV MV distribution feeder in Taiwan [2].…”
Section: Peak Loadmentioning
confidence: 99%
“…The authors of [3,5,9,10,14,24,44,48,[54][55][56][57][58][59][60][61][62][63][64] defined PV HC with reference to the peak load of the feeder as the ratio of the maximum capacity of the PV installation to the maximum load of the feeder. In [65], the authors investigated the HC of a rural European three-phase balanced system for two types of simulations that is one-time slot simulation and time series simulation and an estimated HC of 86% of peak load has been observed. Additionally, the HC based on the peak load of a real USA feeder is found to be 35% [7] and 86% HC value is noticed for an 11.4 kV MV distribution feeder in Taiwan [2].…”
Section: Peak Loadmentioning
confidence: 99%
“…During the normal operation, the DB voltage is greater than the difference voltage. If the difference voltage becomes greater than the DB and exceeding a certain predetermined time delay, the tap position is changed appropriately [23].…”
Section: Voltage‐violation Mitigation Strategiesmentioning
confidence: 99%
“…The results show the high efficiency of the developed method and small differences between actual and estimated voltage values. Its use as the only means of improving voltage levels in the transformer network with OLTC was also proposed in [43]. The study determined the limit of PV connection possibilities for a given network, paying attention to the limitation of OLTC use, resulting from the possibility of undervoltage in lines without connected sources and supplied from the same transformer.…”
Section: Voltage Control In the Transformer Oltcmentioning
confidence: 99%