2014
DOI: 10.1016/j.autcon.2014.04.007
|View full text |Cite
|
Sign up to set email alerts
|

A BIM-enabled information infrastructure for building energy Fault Detection and Diagnostics

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
69
0
1

Year Published

2015
2015
2019
2019

Publication Types

Select...
5
3
2

Relationship

0
10

Authors

Journals

citations
Cited by 150 publications
(72 citation statements)
references
References 6 publications
0
69
0
1
Order By: Relevance
“…The active BIM will be further used in simulations of the building behavior, especially for such parameters as temperature inside or the generally understood comfort, depending on external factors (air temperature, rain or wind) and internal ones (number of people, type of activities) (Dong, O'Neill, & Li, 2014). BIM technologies offer the computational platforms to achieve transition between big data, information technology use and integrated project delivery (Eleftheriadis et al, 2018).…”
Section: Bim Use For Sustainable Public Building Modernizationmentioning
confidence: 99%
“…The active BIM will be further used in simulations of the building behavior, especially for such parameters as temperature inside or the generally understood comfort, depending on external factors (air temperature, rain or wind) and internal ones (number of people, type of activities) (Dong, O'Neill, & Li, 2014). BIM technologies offer the computational platforms to achieve transition between big data, information technology use and integrated project delivery (Eleftheriadis et al, 2018).…”
Section: Bim Use For Sustainable Public Building Modernizationmentioning
confidence: 99%
“…Table 2 shows a summary of the factors identified in the literature review. Eastman et al 2008;Post 2008;Young et al 2008;Yan, Damian 2008;Hartmann, Fischer 2008;Arayici et al 2009Arayici et al , 2011Sacks, Barak 2010;Singh et al 2011;Gerber et al 2011;Nejat et al 2012;Gledson et al 2012;Giel, Issa 2013;Eadie et al 2013;Porwal, Hewage 2013;Zhang, Gao 2013;Migilinskas et al 2013;Volk et al 2014 19 2 Lack of data interoperability (T5) Bernstein, Pittman 2004;Eastman et al 2008;Post 2008;McAdam 2010;Azhar et al 2011;Kim, Anderson 2012;McAuley et al 2012;Rezgui et al 2013;Porwal, Hewage 2013;Aram et al 2013;Migilinskas et al 2013;Gupta et al 2014;Dong et al 2014;Miettinen, Paavola 2014;Volk et al 2014;Cao et al 2015 No. Factors Reference Sum 3 Changes in workflows and inappropriate business models (M4) Bernstein, Pittman 2004;Howell, Batcheler 2004;Méndez 2006;Gilligan, Kunz 2007;Gu et al 2007;…”
Section: Summary Of Factors Identified In the Literature Reviewmentioning
confidence: 99%
“…Improvements in the exchange of information between simulation tools and BIM authoring tools could provide a more concrete source of design information and point of reference during building operations. The same effect could then enable the creation of an accurate up-to-date source of descriptive information useful for FDD and the ongoing performance assessment of a building during its lifetime, such as that demonstrated by Dong et al (2014).…”
mentioning
confidence: 99%