The study aimes at identification of the difficulties in choosing the correct concept of the main building process. The use of a proper BIM design may help the user avoid mistakes and make the building process faster as well as less financial resource intensive. The authors focused on literature review, analysing the difficulties of the BIM design software technology in construction project planning. The biggest flaws in BIM design are inherent in three building process stages: 1) the preparation of a building investment project, and the analysis of the existing situation; 2) the preparation of the building execution technology project; 3) the existing standard processing and information collection in building exploitation period. The analysis shows a persistent need for a deeper BIM design research, to improve information interchange formats that would ensure as much design information saved as possible with ensured feedback. As well as in BIM design, the software packages must be improved by supplementing them with deficient tools or programme codes. After the research of BIM design software, it was determined that architectural, constructional and MEP programs work best interdependently and get analysed the most. These programs work best as they make the least number of mistakes when the model is created in one setting and has many tools. This type of design software data is kept internally, and they are converted into IFC or other information interchange format. Without changing the format, the data is not lost, and this is the reason behind fluent information interchange.
The study presents a sustainable building modernisation model that uses knowledgebased decision-making methods to general reconstruct old public buildings, intending to achieve the best level of energy use on the design scene. The rapid development and dissemination of standards cause multiple research opportunities in the fields of process automation and adaptation of BIM technologies to the prerequisites of existing buildings. Decision-making was widely supported by imitating structures used in the late stages of design. However, its application is not sufficient at the beginning, which affects design solutions with a significant impact on the performance of the completed building. Construction design is a multifaceted discipline where architects, engineers, contractors, and builders influence design decisions. This modernisation way uses digital systems and simulations to estimate the expected energy consumption of construction faster and economically. BIM and critical characteristics are the basis of the model, where design and general processing needs to follow to pre-built instructions. This solution allows estimating energy demand in reconstructed buildings and correlation of parameters.
This research represents sustainable building modernization model, which creates knowledge-based decision-making method for old public buildings refurbishment seeking to reach the best energy performance during the design stage. Despite the fast development and spreading standards, challenging research opportunities arise from process automation and BIM adaptation for existing buildings' requirements. To aid decision-making, building simulation is widely used in the late design stages, but its application is still limited in the early stages in which design decisions have a major impact on final building performance. Building design is a multi-collaborator discipline, where architects influence design decisions, engineers, contractors, and building owners. Using digital systems and simulations this modernization method performs already expected building energy consumption in a quickest and economic way. This model is BIM-based where design and refurbishment are based on pre-built indicators, which allows assessing the building energy demand and eco-building parameters.
Ekspertas: Leonas Ustinovičius (statinio projekto ekspertizės dalies vadovas ir ypatingo statinio dalinės ekspertizės vadovas Kvalifikacijos atestato Nr. 17803). Eksperto padejėja: Jovita Čepurnaitė Vilnius 2016 PASTATO VIDAUS KONSTRUKCIJOS KONSTRUKCIJŲ ESAMA FIZINĖ BŪKLĖ REKOMENDACIJOS VIDAUS DURYS Durų fizinė būklė patenkinama, tačiau estetinis vaizdas yra taisytinas. Rekomenduojama senas duris pakeisti naujomis. 10 2.1. Pav. BIM pagrindu paremtas projektavimo ir atnaujinimo modelis Pastatų skenavimas. Analizuojamų pastatų itin svarbiems techniniams parametrams, priklausomiems nuo plataus spektro aplinkos ir funkcinių veiksnių, apibrėžti būtini skaitmeniniai modeliai (Li Yang 2014). Siekiant sumažinti duomenų konvertavimo į skaitmeninius objektus sąnaudas, autoriai rekomenduoja naudoti lazerinį skenavimo procesą. Tai novatoriškas metodas tiksliai atkurti realaus pastato modelį per palyginti trumpą laiką su minimaliomis darbo sąnaudomis. Lazerinis skenavimas automatiškai įrašo milijoną taškų, apibūdinančių objektą, per sekundę. Skenavimo duomenys gaunami nurodant atitinkamų vektorių elementų, apibūdinančių erdvinę objekto geometriją, vietą ir, jei reikia, pateikiant jų radiometrines reikšmes įvairiais pilkos spalvos atspalviais, dirbtiniu spalvų paletėje ar natūralių spalvų RGB komponentų pavidalu (Gimenez et. all 2016).3D lazerinis skenavimas gali sukurti išsamų vietos ir aukšto lygio sudėtingumo elementų 3D vaizdą. Dėl to mln. taškų per sekundę nuskaitymo greičio skenavimas lazeriu yra efektyviausias metodas 3D dokumentams sukurti. Rezultatas yra taip vadinamas "taškų debesis", t.y. milijonų taškų rinkinys, sudarantis tikslų skenuojamo objekto 3D modelį. Tačiau taškų debesys sudaro netvarkingą didelio duomenų kiekio rinkinį, kuris turi būti registruojamas ir tvarkomas. Šis procesas apima pastato skaitmenizavimą, kurio pabaigoje yra sukuriamas 3D modelis, kuris gali tapti pagrindu aktyvaus BIM modelio sudarymui.Pastato patikrinimas. Pastato energetinė kokybė yra nustatoma energinio naudingumo sertifikatu (parengiamas pagal įstatymą), remiantis dviem indeksais: pirminės neatsinaujinančios energijos EP ir galutinio energijos vartojimo EK. Šiame tyrime, energetinė esamų pastatų kokybė vertinama naudojant EP ir EK indeksus. Taip pat gali būti naudojama ir daugiau dirbtinių indeksų esamų pastatų energetiniam klasifikavimui nustatyti (klasifikacija buvo sukurta 2013 metais dėl teisinių pakeitimų projekto, susijusio su pastato energinio naudingumo sertifikavimu -šiuo metu jie nėra teisiškai taikomi). Pastato energetinės klasę priklauso nuo pastato tipo ir EA indekso reikšmės.3D / 4D modelis ir duomenų bazė. Projektavimas yra komandinis darbas. Keitimasis informacija tarp investavimo dalyvių formuoja bendravimo kokybę. BIM apibrėžia veiklą: pastato informacinis modeliavimas, o ne objektą: pastato informacinis modelis. Pastato informacinis modeliavimas sukuria jo virtualų atvaizdavimą, informatyvaus architektūrinio
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.