A BIM-based framework for construction project scheduling risk management

Abstract: The management of risks has been at the heart of most construction projects. Building Information Modelling (BIM) provides opportunities to manage risks in construction projects. However, studies about the use of BIM in risk management are sketchy with a lack of a systematic approach in using BIM for managing risk in construction projects. Based on existing risk models, this study investigated and developed a BIM-based framework for the management of construction project scheduling risk. Although, the framewor… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
2
2

Relationship

0
8

Authors

Journals

citations
Cited by 9 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…As-built information studies focus on quality control and evaluation of structural members [45]. In [46], a BIM-based early warning model was proposed for construction project cost and risk management, while BIM functions, namely "construction process simulation" and "4D description of construction progress" are widely used in prefabricated construction project management for postproduction planning, resource utilization planning, and workspace congestion analysis [47]. BIM's knowledge management and storage function effectively address discrete information challenges during green building construction, applying construction information modeling to manage quality, schedule, cost, and safety in project supervision [48].…”
Section: Overview Of Bim Application In Construction Project Schedule...mentioning
confidence: 99%
“…As-built information studies focus on quality control and evaluation of structural members [45]. In [46], a BIM-based early warning model was proposed for construction project cost and risk management, while BIM functions, namely "construction process simulation" and "4D description of construction progress" are widely used in prefabricated construction project management for postproduction planning, resource utilization planning, and workspace congestion analysis [47]. BIM's knowledge management and storage function effectively address discrete information challenges during green building construction, applying construction information modeling to manage quality, schedule, cost, and safety in project supervision [48].…”
Section: Overview Of Bim Application In Construction Project Schedule...mentioning
confidence: 99%
“…BIM helped design the two-story residences in Jeddah by integrating construction data. BIM was used to assess design viability and identify concerns [5]. BIM helped project managers avoid expensive redesigns and delays by testing multiple design possibilities before construction.…”
Section: Introductionmentioning
confidence: 99%
“…In recent years, a breakthrough approach to Building Information Modeling (BIM) has been the use of Artificial Intelligence, thanks to which an unprecedented level of efficiency, precision and optimization within project management has been achieved [13][14][15][16][17][18][19].…”
Section: Introductionmentioning
confidence: 99%