1995
DOI: 10.2172/89985
|View full text |Cite
|
Sign up to set email alerts
|

105-KE Isolation Barrier Leak Rate Acceptance Test Report

Abstract: I Name OSTI (2) -X Text Text Only Attach./ EDT/ECN MSIN With All Appendix Only Attach. Only A-6000-135 (01/93) WEF067 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. I

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

1995
1995
1995
1995

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…The leak test procedure was conducted in accordance with the acceptance test procedure (ATP) (McCracken 1995a), The acceptance test report (ATR) (McCracken 1995b), documents completion of all ATP steps. Figure 2 shows the basin and discharge chute level data prior to and during the acceptance test.…”
Section: Acceptance Test Procedure/acceptance Test Reportmentioning
confidence: 99%
See 2 more Smart Citations
“…The leak test procedure was conducted in accordance with the acceptance test procedure (ATP) (McCracken 1995a), The acceptance test report (ATR) (McCracken 1995b), documents completion of all ATP steps. Figure 2 shows the basin and discharge chute level data prior to and during the acceptance test.…”
Section: Acceptance Test Procedure/acceptance Test Reportmentioning
confidence: 99%
“…The tests were performed in accordance with the test plan (McCracken 1995c) and acceptance test procedure (McCracken 1995a). The test report (McCracken 1995b) contains the test data. This document compares the test data (McCracken 1995b) against the criteria (McCracken 1995a, c).…”
Section: Introductionmentioning
confidence: 99%