2007
DOI: 10.1590/s0104-530x2007000300005
|View full text |Cite
|
Sign up to set email alerts
|

Sistemática proposta para seleção de fornecedores em gestão de projetos

Abstract: A gestão de projetos vem sendo alvo de inúmeros estudos nos últimos anos, uma vez que os projetos estão se tornando cada vez mais complexos. Os fornecedores exercem papéis cruciais na gestão de projetos, estando envolvidos em uma rede de atividades conectadas que, se não desenvolvidas de forma adequada, podem comprometer o sucesso do projeto. Dessa forma, aumenta-se a necessidade de fornecedores qualificados, comprometidos com os objetivos do cliente e capazes de empreender os projetos solicitados. A questão a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
1
1

Year Published

2015
2015
2019
2019

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 12 publications
(9 citation statements)
references
References 35 publications
0
7
1
1
Order By: Relevance
“…However, although the criterion "Cost" has great importance in other works (Poksinska et al, 2006;Golmohammadi and Mellat-Parast, 2012;Frade, 2013;Teixeira, 2010;Alencar et al, 2007;Daim et al, 2013;Peng, 2012;Tsaur and Lin, 2012;Wollmann et al, 2011), this situation was not observed in this study. Companies more oriented toward compliance than the actual adoption of quality requirements will decide based on low cost when selecting their certification body (Castka et al, 2015).…”
Section: Resultscontrasting
confidence: 74%
See 1 more Smart Citation
“…However, although the criterion "Cost" has great importance in other works (Poksinska et al, 2006;Golmohammadi and Mellat-Parast, 2012;Frade, 2013;Teixeira, 2010;Alencar et al, 2007;Daim et al, 2013;Peng, 2012;Tsaur and Lin, 2012;Wollmann et al, 2011), this situation was not observed in this study. Companies more oriented toward compliance than the actual adoption of quality requirements will decide based on low cost when selecting their certification body (Castka et al, 2015).…”
Section: Resultscontrasting
confidence: 74%
“…This finding is similar to the results obtained by Andrade and Albuquerque (2012), Chan and Chan (2010) and Mafakheri et al (2011), in which "Quality" was of great importance and "Cost" was one of the least prioritized criteria. Besides that, "Quality" was seen with great importance in manufacturing and service sector works (Golmohammadi and Mellat-Parast, 2012;Frade, 2013;Teixeira, 2010;Alencar et al, 2007;Daim et al, 2013;Tsaur and Lin, 2012). The results indicate that the certification bodies that perform high quality auditing would receive the preference of companies that want to certificate their QMS.…”
Section: Resultsmentioning
confidence: 98%
“…The first approach is to bring together different points of view within a single function synthesis which can be further optimized. The second is mainly used for troubleshooting of multiple objectives that require a more robust mathematical programming and the third results in a ratio overon a set of alternatives from alternatives paired comparisons (Alencar, 2006;Almeida, 2005;Roy, 1996).…”
Section: The Multicriteria Problem and The Promethee Methods IImentioning
confidence: 99%
“…As stated by Alencar et al (2007), the phases of a life cycle can vary according to the nature of the project, but overall, they include viability (initial phase), planning, execution, control, and completion. Different people can manage each of these phases, and not everyone on the team will be involved project.…”
Section: Project Managementmentioning
confidence: 99%