Well#1 was completed as horizontal oil producer with Openhole Stand-Alone Sandscreens (OHSAS) across a thin reservoir with average thickness of 20ft in Field B. The first Autonomous Inflow Control Device (AICD) in PETRONAS was installed to ensure balanced contribution across horizontal zones with permeability contrasts and to prevent early water and gas breakthrough. Integrated real-time reservoir mapping-while-drilling technology for well placement optimization combined with industry-leading inflow control simulator for AICD placement were opted. The early well tests post drilling showed promising results with production rate doubled the expected rate with no sand production, low water cut and lower Gas to Oil Ratio (GOR). Reservoir Management Plan (RMP) for this oil rim requires continuous gas injection into gas cap and water injection into aquifer. However, due to low gas injection uptime caused by prolonged injection facilities constraints, the well's watercut continued to increase steadily from 0% to 80% within a year of production despite prudent surveillance and controlling of production during injector's downtime. After the gas injection performance has improved, the well was beaned up as part of oil rim management for withdrawal balancing. Unfortunately, a month later, the production rate showed a sudden spike with significantly low wellhead pressure, followed by hairline leak on its choke valve and leak at Crude Oil Transfer Pump (COTP) recycle line. Sand analysis by particle size distribution (PSD) confirmed OHSAS failure, while the high gas rate from well test results confirmed AICD failure. A multidisciplinary investigation team was immediately formed to determine the root cause of the failure event. Root Cause Failure Analysis (RCFA) method was opted to determine the causes of failures, including the reanalyzing of the OHSAS and AICD completion design. The well operating strategy was also reviewed thoroughly by utilizing the well parameters trending provided in the Exceptional Based Surveillance (EBS) Process Information (PI) ProcessBook. Thorough RCFA concluded that frequent platform interruptions and improper well start-up practices have created abrupt pressure changes in the wellbore, which has likely destabilized the natural sand pack around the OHSAS and created frequent burst of sand influx across AICDs. The operating of a high gas-oil ratio (GOR) and high watercut sand prone well without pre-determined AICD sand erosion toleration envelope have also likely contributed to the failure of AICDs. The delay in detection of OHSAS failure in Well#1 due to ineffective sand monitoring method thus resulted in severe sand production which caused severe leak at its choke valve and COTP recycle line.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.