In Japan speed tests in the region of 300 kmh have been carried out since the Oyama test line recorded a 3 19 kmh run in 1979. TGV recorded a 515.3 km/h run by an electric locomotive installed with a pantograph in 1990 and ICE achieved 406.9 k m h using a similar train in 1988.High-speed current collection tests over 400 k m h using electric railcars have been desired in Japan. Problems of high-speed tests are: train speed approaching wave propagation velocity, multipantograph resonance, and too large uplift of contact wires caused by lift. It is necessary to keep wave propagation velocity of contact wire higher than train speed. CS contact wire and TA contact wire were compared in high-speed tests because it was impossible to get a good current-collecting performance by using hard-drawn copper contact wires. In December 1993 using these contact wires we carried out high-speed tests in the region of 400 kmh on Jyoetsu Shinkansen with the test train STAR 21 which JR-EAST built for high-speed tests. This paper reports the current collecting performance of these contact wires predicted by simulation and running tests at 425 kmh. 0 1998 Scripta Technica, Electr Eng Jpn, 124 (3): [73][74][75][76][77][78][79][80][81] 1998
Jyun-ihi Satoh, Member (JR-EAST), Yasu Oura,Member, Yasukazu Fujii, Member (RTRI)In Japan speed tests in 300 km/h region have been carried out since Oyama Test Line recorded a 319km/h run in 1979. Meanwhile TGV recorded a 515.3 km/h run by an electric locomotive installed with a pantograph in 1990 and ICE did 406.9 km/h using similar train in 1988. High speed current collection tests over 400 km/h using electric railcars have been desired in Japan. Problems of high speed tests are : train speed approaching wave propagation velocity, multi-pantographs resonance, and too large uplift of contact wires caused by lift. It is necessary to keep wave propagation velocity of contact wire higher than train speed. CS contact wire and TA contact wire were compared in high speed tests because it was impossible to get a good current collecting performance by using hard-drawn copper contact wires. In December, 1993 using these contact wires we carried out high speed running tests of 400 km/h region on Jyoetsu Shinkansen with the test train STAR 21 which JR EAST built for high speed tests. This paper gives the current collecting performance of these contact wires predicted by simulation and running tests at 425km/h.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.