In order to reduce waiting time in port for large LNG (liquefied natural gas) fueled ships, it is suggested that LNG STS (ship to ship) bunkering and cargo loading/unloading should be carried out simultaneously. This study investigated the safety zone of an LNG bunkering vessel with 10,000 cubic meters capacity transferring LNG fuel to an LNG fueled 18,000 TEU containership. Four LNG leakage scenarios were identified based on failure frequencies analysis of piping systems and severity of consequence, three-dimension CFD software FLACS was adopted to calculate flammable cloud dispersion after LNG leakage. As a result, we obtained a rectangle dangerous zone (41.3 m × 126 m), outside of this dangerous zone can be defined as safety zone. It is concluded that safety zone of LNG STS bunkering and cargo loading/unloading SIMOPS (simultaneous operations) cannot keep the same, there are different results for different designs and operation locations. Due to high frequencies and severe consequences, two typical scenarios, the leakage of LNG hose and the natural gas releases from bunkering tank's safety relief valve during bunkering, cannot be ignored in similar study.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.