In the automotive industry, a Body in White (BIW) refers to the first step, the basic structure, in the production of a vehicle. Once a BIW production line has been built, the (maximum) capacity is fixed and throughput is therefore limited by the equipment specified during the design phase. The main metric used to inform the production line design is the Net Ideal Cycle Time (NICT). Unfortunately, the state of practice to estimate the NICT is a basic heuristic that does not account for production variation. In this paper, we challenge the current estimation approach by proposing an alternative that assumes actual production to follow a Weibull distribution. The proposed model is derived and estimated from empirical data. The results suggest that BIW production lines have traditionally been designed with too low a capacity, resulting in planned throughput rarely being achieved. On the other hand, increasing the design capacity implies a higher initial investment. In this paper it is demonstrated that the higher investment required is offset by reduced losses, resulting in more reliable planning and returns.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.