ABSTRACT:Historical Building Information Modeling (H-BIM) has been widely documented in literature and is becoming more popular with government bodies, who are increasingly choosing to make its use mandatory in public procurements and contracts. Although the system seems to be one of the best approaches for managing data and driving the decision-making process, several difficulties arise due to the amount of effort required in the initial phases, when the data derived from a geometrical survey must be converted into parametric elements. Moreover, users must decide on a "level of geometrical simplification" a long time in advance, and this inevitably leads to a loss of geometrical data. From this perspective, our research describes a procedure to optimize the workflow of information for existing artefacts, in order to achieve a "lean" H-BIM. In this article, we will analyse two aspects: the first relates to the level of accuracy in a digital model created from the two different point clouds achieved from laser scanner and form images, while the second concerns the conversion of this information into parametric elements (Building Object Models-BOMs) that need to have specific characteristics. The case study we are presenting is the "Ponte Giorgini" ("Giorgini Bridge") in Castiglione della Pescaia (Grosseto -Italy).
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.