This research is to address a problem of scheduling batches consisting of multiple item parts processed on a batch processor where each item requires a certain processing time which may differ from others. A number of parts are defined as a batch and processed simultaneously with sharing a set up time. A batch can be formed of the parts with different type of item and the processing time of batch equals the longest processing time of parts in the batch. It is assumed that an excessive duration of processing the parts will not lead to any defect, but increase the operating cost. The completed part must simultaneously be delivered at common due date, d. The objective is to minimise total actual flowtime of parts through the shop. A solution procedure to solve the problem is proposed and numerical examples are shown.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.