Due to the global warming and energy resource shortage, renewable energies such as wind generation (WG), photovoltaic (PV) facility are getting more attention in distribution systems. It is very necessary to use renewable energy with present power equipments cooperatively as it can be easily affected by the different weather conditions. Since the cost of diesel generator (DG) is high when starting up or shutting down, the electric power system should consist of small power system groups and share electric power with each other by interchanging. In this paper, the optimal method is proposed to determine the scheduling of the isolated island power system including WG, PV facility, DG, and battery energy storage system (BESS). The optimization is divided into two parts using genetic algorithm. First, the scheduling problem of DG unit commitment is decided by the revised load with the optimal operation of individual power system. Second, optimization of the electric power system group is performed by using the results of first step. The simulation results show the reduction of operational cost which confirms the feasibility and effectiveness.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.